Slab-on-Grade
Commercial Building Pad & Slab-on-Grade
Large-area reinforced slabs-on-grade with perimeter thickened edges and vertical starter dowels for a multi-building commercial site.
Overview
The work.
Multiple large building pads were formed, reinforced and placed in planned sequences, with pour breaks located to suit site access, truck traffic and finishing crew capacity.
Vertical dowels were set to layout and checked before every placement, delivering slabs that were ready for wall construction without drilling or re-work.
Scope
- Large-area reinforced slab-on-grade
- Thickened slab edges & interior footings
- Vertical starter dowels for wall construction
- Formwork, screeds & pour-break layout
- Hard-trowel finish & curing
- Ready-mix & pump logistics